Skip to main content

Create your account

Register your company on Zaptiz Construction with your name, work email and password, then a 6-digit code. You become the company administrator.

Where
  1. construction.zaptiz.com
  2. Start free
Who
  • Company Admin

Registering creates a new company workspace with you as its administrator. If your company already uses Zaptiz, do not register — ask your Company Admin to add you, then sign in. Registering again creates a second, empty company.

Create your account

Register​

  1. Open construction.zaptiz.com and click Start free at the top right. From the sign-in page, click Create account at the top right or Create your company account under the form.
  2. Enter your Full name.
  3. Enter your Work email. The verification code goes here, and this address becomes your login.
  4. Choose a Password. A checklist appears as you type; every item must be ticked: 8+ characters, Lowercase, Uppercase, Number, Symbol.
  5. Type it again in Confirm password.
  6. Click Create account.

You are not signed in yet. The form is replaced by a code screen.

Verify your email​

  1. Open the email from Zaptiz. It carries a 6-digit code, valid for 10 minutes.
  2. Type the code into the six boxes. You can paste the whole line from the email — the digits are picked out of it.
  3. The code is checked as soon as the sixth digit goes in. You can also click Verify and continue.

Once the code is accepted you are signed in, a confirmation email is sent, and the setup wizard opens.

If the code does not arrive​

  • Wait for the timer. Resend in 0:59 counts down from one minute; after that the link reads Resend code. Each new code replaces the last — only the newest one works.
  • Check spam and any quarantine your company's mail filter uses.
  • Wrong address? Click Use a different email to go back to the form.
  • Closed the tab? Go to the sign-in page and sign in with your email and password. Zaptiz sends a fresh code and shows the code screen straight away.
warning

Five wrong tries spend a code. After that, ask for a new one with Resend code.

What gets created​

ItemDetail
Your companyA private workspace. Other companies never see your data.
Company nameA placeholder — for example "Ravi's company" — until you enter the real name in step 1 of setup.
Your userRole: Company Admin. You hold every permission and can add the rest of your team.
Units of measureA standard list (cum, sqm, kg, nos and so on) is loaded, so you can create resources and rate analyses at once.

There is no card to enter and nothing to pay at this stage. Plans are handled later under Subscription & billing.

Messages you may see​

MessageWhat to do
… already has an account. Sign in instead.That email is registered. Use Signing in, or Forgot password? there.
Password needs an uppercase letter, a symbol.The password misses the rules named. Every checklist item must be ticked.
That code is not right. 4 attempts left.Retype the newest code from your inbox.
That code is not right, and this one is now spent. Ask for a new one.Click Resend code.
That code has expired. Ask for a new one.Codes last 10 minutes. Click Resend code.
A code was just sent. Give it a moment before asking again.Wait for the one-minute timer.
This email is already verified. Please sign in.Verification is done — sign in normally.
Too many attempts. Please wait a moment and try again.Too many requests from your network in a short time. Wait a minute.

Tips​

  • Use an address you will keep. Your login email cannot be changed later; a different address means a different account.
  • Register with the person who will administer the company. You can make others Company Admin later, and it is safer to have two.