Skip to main content

Pre-construction

Everything before the award — chase the enquiry, build the rates and the BOQ, send the quotation, and award the contract that turns a bid into a project.

Where
  1. Commercial
Who
  • Company Admin
  • Project Manager
  • QS / Estimator

Pre-construction is the bid side of the job. It starts when an enquiry or tender comes in and ends the moment you record the award. From then on the work lives in a project.

Commercial hub

The chain from enquiry to award​

LeadClientRatesBOQQuotationContract
  1. A lead records the enquiry: who it is from, where the site is, how big, and where it sits in your funnel.
  2. The prospect becomes a client — a quotation cannot be raised without one.
  3. Resources (materials, labour, plant, subcontract, services) carry your standard rates. Rate analyses build an item rate from them.
  4. A BOQ lists the work with quantities, priced from rate analyses or by hand. You can type it, import the client's Excel file, or have the BOQ Generator draft it.
  5. A quotation copies the BOQ into an offer, which you sharpen, send and revise.
  6. Awarding a contract from the quotation creates or links the project, sets its contract value and terms, and marks the quotation and the lead won — all in one step.

Where to find it​

The Company Admin, Project Manager and QS / Estimator see Commercial in the sidebar. It opens a hub of tiles:

SectionTileOpens
BidRate LibraryThe Estimation page, rate analyses first
BidBills of QuantitiesThe Estimation page, BOQ list
BidQuotationsThe quotation register
WinLeadsThe enquiry pipeline
WinContractsThe contract register and the award
WinClientsThe client master

Leads and Estimation also have their own sidebar entries. Resources and Clients sit under Masters.

Pages in this section​

PageWhat you do there
LeadsLog enquiries, work the funnel, convert a prospect to a client
ClientsKeep the client master — contacts, sites, GSTIN and state code
ResourcesMaintain the catalogue and the standard rates every estimate starts from
Rate analysisBuild an item rate from coefficients, wastage, overhead and profit
Bills of quantitiesBuild, price and approve a BOQ
Import a BOQ from ExcelBring the client's BOQ workbook in without retyping it
TakeoffUpload a drawing set, check sheet scales and take quick measurements
QuotationsTurn a BOQ into an offer, send it, revise it
ContractsAward the job and keep its agreed terms

Who does what​

RoleTheir part
QS / EstimatorLogs and works leads, maintains resources, builds rate analyses and BOQs, drafts quotations
Project ManagerReads the pipeline, approves BOQs, sends quotations and records the outcome
Company AdminEverything above, plus creating clients, converting leads and awarding contracts
Procurement ManagerAdds and edits resources; sees BOQ quantities but not rates
AccountantEdits clients, reads contracts and BOQ rates

The rules that govern this area​

Prices are copied, never linked

A rate analysis rate is copied onto a BOQ line when you add it, and a BOQ is copied into a quotation when you create it. Changing a rate upstream never changes a document you have already priced or sent. That protects a bid that is already with a client — and it means you update downstream documents yourself.

  • A quotation is won only by an award. Nobody marks a quotation won by hand; awarding the contract does it, together with the project and the lead.
  • The person who prices is not the person who signs. A QS / Estimator prepares; a Project Manager approves the BOQ and sends the quotation; the Company Admin awards.
  • Rates are shown only to roles that need them. A Site Engineer or QA/QC Engineer opening a BOQ sees quantities with the rate and amount columns missing. See Roles and permissions.
AI

Four AI agents work in this area and appear in the hub's AI agents section: the BOQ Generator drafts a BOQ from a scope or a messy file, Rate Suggestion fills blank coefficients, Resource Catalog Match links BOQ lines to your catalogue, and the Tender & Contract Analyser pulls the clauses that move money out of a tender. They only draft — nothing changes until you confirm.